![]() |
Unitsky String Technologies |
![]() ![]() |
Site news
16 July 2016 |
|
EcoTechnoPark: start of building the SkyWay freight overpass The Contractor started the process of building the SkyWay freight overpass. Excavation work is under way. ![]() Ground was filled inside the Western anchor support on the urban and high-speed tracks. This makes the structure heavier and, at the same bearing capacity, reduces the amount of concrete necessary for its construction. As a result, the cost of construction is significantly decreased. In addition, the ground inside the support will be used for its greening and, therefore, performs an aesthetic function, too. ![]() On the Eastern anchor support integrated into the transport and logistics hub, work continues on the construction of the stair unit, which will connect the three floors of the structure: the SkyWay urban and high-speed stations, as well as the Museum of EcoTechnoPark history located at the ground floor. ![]() |
© 19772017 Anatoly Yunitskiy. All Rights Reserved. |