16 March 1991
|
|
Scientific papers on GPV program
This publication contains the list of scientific works in chronological order on GPV program performed through the funds allocated by the Soviet Peace Foundation for the joint program "Star world" (Resolution by the Executive Bureau of the Soviet Peace Foundation dated May 25, 1988 No. 34-88/B). It was approved by the Director of "Star world" Center, the scientific Director of GPV Program Anatoly Yunitskiy.
- Ecoterra Program (in Russian) approved on August 23, 1988.
- Ecoterra Program in English.
- Ecoterra Program in French.
- The general principles of functioning and organizational structure of "EcoWorld" Fund (in Russian), report on contract No. 19/GPV approved on December 9, 1988.
- Research on the problem of training young people to implement the concept of non-rocket space industrialization (in Russian), report on contract No. 4/GPV approved on January 12, 1989.
- Analysis on the main aspects in the monetary and financial system of the united world under the program "EcoWorld" (in Russian) approved on January 20, 1989.
- Analysis of technical means providing acceleration of an object of unlimited length in a vacuum channel up to 10 km/s speed (in Russian), work under contract No. 16/GPV approved on January 20, 1989.
- Scientific basis for non-rocket industrialization of space (in Russian), report on research theme approved on January 30, 1989.
- Development of organizational aspects in personnel support of the program "EcoWorld" as a possible scenario for the development of civilization (in Russian), work under contract No. 14/GPV approved on February 4, 1989.
- Environmental justification and theoretical basis for the promotion of the program "Star world" in participating countries (in Russian), report on contract No. 9/GPV approved on February 11, 1989.
- Principles and mechanism of international cooperation in the implementation of GPV project (in Russian), report on the development of the scientific project under contract No. 1/GPV approved on February 20, 1989.
- Power supply issues of the GPV project on land and sea areas (in Russian), report on scientific research work under contract No. 7/GPV approved on March 7, 1989.
- Historical background to implement the program "Star world" as a possible way for civilization development (in Russian), scientific work under contract No. 11/GPV approved on March 16, 1989.
- Research and development of requirements to reliability, viability and safety of GPV and its models (in Russian), report on scientific research work approved on April 1, 1989.
- Analysis on the possible use of superconductivity to provide propulsion and electro-dynamic suspension to the rotor of the General Planetary Vehicle (in Russian), report on scientific research work approved on April 12, 1989.
- Research on the problem of training young people to implement non-rocket space industrialization concept (in Russian), recommendations on practical implementation of proposals from the report approved on April 22, 1989.
- Analysis on design versions of GPV overpass and its optimization (in Russian), report on engineering survey work under contract No. 23/GPV approved on April 30, 1989.
- Analysis on the dynamics of GPV exit into outer space in Earth's Equatorial plane (in Russian), report on scientific research work under contract No. 12/GPV approved on July 17, 1989.
- Analysis on the dynamics of GPV exit into outer space under the conditions of planets having Equatorial circles. The problem of maneuvering the rotor (in Russian), report on scientific research work approved on August 17, 1989.
- Development of the "HomoWorld" concept and its implementation within the activities of "EcoWorld" Fund (in Russian), work under contract No. 29/GPV approved on August 24, 1989.
- Ànalysis on GPV interaction with electromagnetic phenomena in the atmosphere (in Russian), scientific work approved on September 19, 1989.
- Creation of mathematical models of GPV rotor motion at the stages of acceleration and release into the atmosphere (in Russian), report on scientific research work approved on December 25, 1989.
- Mathematical modeling of the dynamics and study of the stability of the General Planetary Vehicle (in Russian), report on the contract No. 21/GPV published on February 5, 1990.
- "EcoWorld" program (in Russian) published on August 1, 1990.
- Preliminary system analysis on the main aspects of the idea "General Planetary Vehicle" (in Russian), report on scientific research work under contract No. 5/GPV approved on October 2, 1990.
|